Laserfiche WebLink
. Ira€,e 3 ,; <br />wr ~ -- j,; <br />The previously advocated storm draina~'e system of the. Rice <br />• Creels 1Yatershed District included a ne~~~ pond in the "low area <br />near the center of the site where previous mining operations <br />removed much gravel. This pond would be connected to the existing <br />pond at the north-east: corner of the site. This pond is <br />connected to the storm sewer system via underground routes <br />below Silver Lake Road; to the residential Cul-de-sac storm <br />and then to the Third Street storm draining east. This approach <br />to site drainage appears to be an adequate solution. <br />The City of New Brighton staff present ~~~ere very helpful in <br />outlining the proceedures for rezoning .and expressed their <br />desire to offer any technical assistance requested by the <br />Deiseloper/Architect team. <br />C~ <br />• <br />