My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECA 02-06-1980
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
AGENDAS
>
1980
>
PRECA 02-06-1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2007 3:55:38 AM
Creation date
3/16/2007 7:35:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Ira€,e 3 ,; <br />wr ~ -- j,; <br />The previously advocated storm draina~'e system of the. Rice <br />• Creels 1Yatershed District included a ne~~~ pond in the "low area <br />near the center of the site where previous mining operations <br />removed much gravel. This pond would be connected to the existing <br />pond at the north-east: corner of the site. This pond is <br />connected to the storm sewer system via underground routes <br />below Silver Lake Road; to the residential Cul-de-sac storm <br />and then to the Third Street storm draining east. This approach <br />to site drainage appears to be an adequate solution. <br />The City of New Brighton staff present ~~~ere very helpful in <br />outlining the proceedures for rezoning .and expressed their <br />desire to offer any technical assistance requested by the <br />Deiseloper/Architect team. <br />C~ <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.