My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECM 12-05-1984
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
MINUTES
>
1984
>
PRECM 12-05-1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 2:54:11 AM
Creation date
3/29/2007 2:57:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Day Camp <br />This program has grown in the last 3 years to its maximum if we are to <br />continue jointly ..with St. Anthony. In 1983 St. Anthony .,had 11 parti- <br />cipants (total 58) and in 1982 they had 20 (total 66). But in 1984 <br />we did not have enough registrations to offer this program. One <br />of the reasons may have been the fact we were forced to move the location <br />(but we still provided the transportation). <br />Beach <br />Weather conditions were not as favorable this year. We also opened <br />approximately 2 weeks later than in past years due to the treatment <br />process done this spring. We still feel that we will offer the service <br />of the beach in 1985, but. on a more limited basis until the site i$ <br />moved to its new location. <br /> <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.