My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECM 02-01-1984
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
MINUTES
>
1984
>
PRECM 02-01-1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 2:50:58 AM
Creation date
3/29/2007 3:20:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 1,.19.84 Park Board. Minutes <br />Page 5 <br />Anderson said grading will have to be done. at Freedom Park but it <br />is not known how much. Freedom is a developed park and no grading <br />for park purposes is foreseen. He recommeded this plan not .be <br />approved until it can be shown what grading will have to be done.. <br />Gunderman said the school playground at Pike Lake is wet. <br />Anderson said Veterans Park will; be redone in the near future. <br />No need for a study for stormwater at this park_but a-study <br />is necessary for Freedom.. <br />Kramer-said there has to be drainage at Vets according to the <br />criteria. <br />Anderson said water storage could be on private property in the <br />Veteran Park area. <br />Gunderman asked what is done in developed areas where there are <br />no parks. <br />Kramer said big, pipes are used but it is very expensive.- <br />Gunderman asked the Park Board .for their comments. <br />Carlson expressed concern about Freedom Park. It appears that <br />half the park would be unusable. <br />Anderson. said a specific plan will. have to be prepared to determine <br />the impact on Freedom Park. <br />Proper said that this is just a plan. .They want to do the best job <br />in regard to flooding and water .quality, If it_would greatly affect <br />the utility of the .park, another alternative of installing the <br />larger storm sewers may be the only practical solution. <br />Van Hatten said. he shares Carlson's concern .about Freedom and is <br />also concerned with the possibility of 6 feet of water being ponded <br />in Hidden Oaks Park. <br />Hogan mentioned he was concerned about Freedom: <br />Rose had no comment. <br />Solberg also expressed concern with the 6 foot bounce at Hidden-Oaks. <br />Gunderman is concerned-with the inbetween floods, 5 year, etc. <br />Kramer said the objective of the plan is to maximize storage and... <br />minimize cost. If no storage is provided, a large and expensive <br />convenance system will be needed to guard against flooding, <br />Dahl said it has all been said. <br />Gunderman said most have not studied the plan, he suggests it is <br />put on the agenda for next month. <br />
The URL can be used to link to this page
Your browser does not support the video tag.