My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECA 05-01-1985
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
AGENDAS
>
1985
>
PRECA 05-01-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 2:39:55 AM
Creation date
3/30/2007 12:41:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unstable soil and high ground water conditions were encountered <br />along a 300 foot section of the utility easement and probably <br />will require a redesign of this section of sanitary sewer main. <br />Staff from the Department. of Public Works currently are working <br />on alternative solutions to mitigate the problem. <br />Staff is currently revising the plans for the swimming beach <br />parking lot in accordance with the directive of the County Board. <br />E. Petroleum Products Repository <br />Bids were opened on March 13. Staff has reviewed the bids and <br />accompanying disposal plans and will recommend that the bid be <br />awarded to Environmental Services Group Inc. of Rock Island, <br />Illinois with the award being conditional upon receipt of: <br />a.) Minnesota Pollution Control A ency approval of Disposal <br />Plan Submitted by contractormaterial to be hauled by <br />trucks to site in Illinois), and <br />b.) copy of Disposal Permit issued by Illinois Environmental <br />Protection Agency. <br />~.~ Historical 5o_o_Line Depot (New Brighton Area Historical Society <br />Status Quo - refer to previous reports (Depot has been included <br />in staff proposed Master Plan amendments). <br />G. Re ional Park Master Plan Amendments <br />Staff has prepared and is proposing three development amendments <br />to the Master Plan. The amendments have been stimulated by annual <br />staff review and reevaluation of the general development concept <br />and specific action requests by the New Brighton Area Historical <br />Society and the Lang Lake Improvement Associatian. The amendments <br />address: 1) location of the boat launch facility, 2) designation <br />of a Historic Preservation Zone and 3) siting of a historic depot. <br />The proposed amendments have been submitted to the Long Lake <br />Regional Park Advisory Board which will review and take action <br />on the amendments at its April meeting.. The subject ,amendments <br />will be submitted for approval to the County Board and New <br />Brighton City Council during May. <br />II. BALD EAGLE-DTTER LAKE REGIONAL PARK <br />Development and approval of Master Plan <br />Status Quo - refer to previous reports. <br />III. GRASS VADNAIS REGIONAL PARK <br />Joint Powers Agreement between Water Department and Ramsey County <br />Status Quo - refer to previous reports. <br />IV. RICE CREEK NORTH REGIONAL TRAIL CORRIDOR <br />Status Quo - refer to previous report.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.