Laserfiche WebLink
• Mr. Henr Sinda -2- October 20,~ 1986 <br />Y <br />The proposed traiiway easements are below the normal grade of the tracks <br />at the edge of the railway right-of-way and the proposed trail will not <br />interfere with the Railway Company's normal use of its right-of-way. <br />Trail construction is scheduled for the 1987 construction season. If <br />you have any questions relative to this matter or require additional <br />..documentation, contact Ken Simons at 777-0393. <br />Sincerely, <br />An ony J. Crea <br />Director <br />AJC:jjh <br />• cc: K. Simons, <br />• <br /> <br />