Laserfiche WebLink
-2- <br />Development Issues <br />The ball diamond is located in the southeast corner of the park.. <br />St. John's Church has requested a change in location of the diamond <br />(letter attached). It is our opinion that the recommended configure- <br />tion allows us to have a ball field without excessive negative impact <br />an the rest of th® park. Tf the ball field was located with the <br />backstop n®ar the ~sity hall parking lot, it becomes very difficult <br />t4 ei.te the pond and free skating area. The ball f~.eld shown on <br />the plan has a 255' outfateld distance, .the present field is 265'. <br />If the council vacates or removes 3rd Ave, the ball field will be <br />extended and buffering would occur between he field and each of <br />the parking lots. <br />The. concert grove is designed to serve as a site for concerts/per- <br />formances and also as an informal picnic area, it does not have <br />the acoustical benefits of a band shell but is much more versatile <br />and much cheaper to construct... The conceit grove could also be used <br />for small scale civic celebrations such as Memorial Day observances. <br />The primary entrance to the park is off 5th Ave. Nw and is informal <br />in design. with a park sign, relocated veterans memorial and a small <br />plaza area. There are five secondary entrances shown on the plan. <br />The pond is designed to retain about 2.5 fast of water, during <br />storms water would overflow the banks and flood the adjacent 50100 <br />.foot area around the pond. The overflow ponding area would be used <br />as a free skating area in the winter .giving skaters an opportunity <br />to skate around the entire pond. This would undoubtedly become the <br />.premier skating facilty in the .city. <br />The shelter building is located on a portion of the park where soils <br />should be acceptable. Present plans envision a less elaborate structure <br />that we have in the rest of the systm however, the building .would be <br />heated and have bathroom facilities. A cost range of $25,000 - $50,000 <br />is anticipated. The building is located so as to provide direct access <br />to the skating area. <br />The play equipment area is divided into two separate units; one unit <br />for children 3-6 years and one for 6 years and up. Standard, <br />commercially designed wood structures would be used. <br />The pathway system is a 7 foot wide bituminous surface .path intended <br />to be used for bikers and hikers. <br />Funding for 1986 development is set at $50,000, TIF sources, funding <br />.for 1987 and 1988 is-being proposed in the 1987-91 CIP at $30,000 and <br />$70,000 respectively. Funding sources have not yet been identified. <br />The planner has identified development costs of $208,000 for the project, <br />the CIP proposes city expenditures of $175,000. I am proposing that <br />funding for the $33,000 short fall be requested from St. John's School <br />and the New Brighton Eagles Club. Both have previously been approached <br />on this matter and neither has said no~, yet. <br />• <br />