Laserfiche WebLink
LOGAN PARK CMINNEAPOLIS) <br />Kitchen <br />Gym <br />Meeting rooms <br />Craft room <br />Lounge <br />COLUMBIA HEIGHTS <br />Meeting rooms <br />Kitchen-community room <br />Teen center <br />Senior Center <br />The following chart illustrates 1986 estimated costs of three <br />facilities, costs were. not available for Minneapolis and Columbia <br />Heights. The City of Shoreview is considering the construction a <br />pool/gym/meeting and community room facility at a cost of <br />approximately 6 million dollars. <br />1986 1986 1986 <br />COMMUNITY AREA(SQ.FT.) ADJUSTED COST COST/SQ.FT. COST/CAPITA <br />St. Louis Park 48,000 $ 5,040,000 $ 105.00 $ 105.00 <br />Eden Prairie 140,000* 8,219,000 58.71 228.30 <br />Brooklyn Center N/A 4,760,000 N/A 158.67 <br />*Includes facilities which are shared with high school <br />Space requirements for a building of this size and parking with <br />normal site amenities is around 12 acres. All of the facilities <br />visited and all those in various stages of planning around the <br />Twin Cities require operating subsidies. The level of subsidy <br />required is impossible to predict without a known facility and <br />known program demands. The facility being considered in <br />Shoreview. is likely to require an annual subsidy in excess of $100,000. <br />