Laserfiche WebLink
<br />19$7 - 1991 CIP PARKS <br />1 9 8 7 <br />LIGHT ATHLETIC FIELD & STORMWATER RETENTION-FREEDOM $150,.000 <br />VETERANS PLANTINGS AND PLAY EQUIPMENT t~ ~ $ 30,000 <br />HANSEN PARK PATHWAY $ 7,000 <br />1 9 8 8 <br />VETERANS SHELTER ~ $ 70,000 <br />PLAYGROUND .EQUIPMENT $ 15,000 <br />RELOCATE HOCKEY RINK AND UPGRADE LIGHTING $ 20,000 <br />AT HIDDEN OAKS <br />FREEDOM PARKING UPGRADE $ 20,000 <br />.HARD COURT - SILVER OAK $ 8,000 <br />1 9 8 9 <br />REPLACE HOCKEY RINK - TOTEM POLE $ .10,000 <br />HANSEN OR DRIFTWOOD TENNIS COURT $ 45,000 <br />PERMANENT FENCING -SUNNY SQUARE $ 8,000 <br />PICNIC SHELTER - TOTEM POLE $ 10,D00 <br />LONG LAKE ROAD CROSSING $ 0 - 175,000 <br />1 9 9 0 <br />REPLACE HOCKEY RINK FREEDOM $ 10,000 <br />HANSEN PICNIC SHELTER $ 10,00.0 <br />PLAYGROUND EQUIPMENT $ 15,000 <br />1 9 9 1 <br />TRAIL-SYSTEM - OLD HWY. 8 CORRIDOR. $ 30,000 <br />' HARD-COURT AREA DRIFTWOOD $ _10,000 <br />REPLACE HOCKEY RINK - HANSEN $ 20,000 <br />