My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-10-2007
NewBrighton
>
Council
>
Packets
>
2007
>
CCP 04-10-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 1:42:10 AM
Creation date
4/6/2007 4:20:27 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />This is Exhibit A to Amendment Number 1, dated <br />March 14, 2007 <br />Scope of Services <br />This Amendment Number 1 includes the following services: <br />Task 1 -Highway Realignment/West Side Developer Coordination <br />Early on in the final design process, the City requested that we prepare several exhibits (plan- <br />view layouts and cross sections) and assist in coordination with the developers on the west side <br />of Old Highway 8. This coordination resulted in the need to adjust the alignment of Old <br />Highway 8 to accommodate setbacks as required by the developer. We revised the alignment <br />accordingly and made the necessary revisions to proceed with the final design. <br />Task 2 -Property Acquisition Exhibits <br />As requested by City staff, we have prepared several exhibits to assist the City in property <br />acquisition negotiations adjacent to Old Highway 8 within the project limits. We have prepared <br />the fallowing property exhibits: <br />• 1. Ferrell Gas showing Old Highway 8 impacts with and without sidewalk construction <br />2. Railroad Exhibit <br />3. AAA Cooper showing pond construction (3 options) <br />4. Post Office showing Old Highway 8 impacts with and without sidewalk construction <br />5. Crass section of roadway improvements in front of Post Office <br />6. Post Office temporary access (2 options) <br />7. Billboard south of Post Office <br />Task 3 -Environmental Contamination Coordination <br />We have coordinated with Barr Engineering regarding remediation of environmental <br />contamination anticipated to be encountered during construction of improvements associated <br />with Old Highway 8 reconstruction, particularly at the north pond. We have performed or are in <br />the process of performing the following tasks: <br />• Prepare exhibits showing roadway and pond improvements associated with construction <br />of Old Highway 8 for inclusion in the Development Response Action Plan (DRAF) to be <br />prepared by Barr Engineering for submittal to the Minnesota Pollution Control Agency. <br />• Review DRAP as it relates to reconstruction of Old Highway 8 and associated <br />improvements. <br />• Coordinate pay items associated with environmental remediation. <br />. • Coordinate environmental remediation cost estimates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.