My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-10-2007
NewBrighton
>
Council
>
Packets
>
2007
>
CCP 04-10-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 1:42:10 AM
Creation date
4/6/2007 4:20:27 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Incorporate detail sheet prepared by Barr Engineering for inclusion in the Old Highway 8 <br />constructiari plans. <br />• Incorporate special provisions for environmental remediation work in the technical <br />specifications far the project. <br />Task 4 -Private Utilit~Caordination <br />As requested by City staff, we have coordinated the proposed Old Highway 8 reconstruction with <br />private utilities to address the following: <br />• Overhead utility burial issues, including easement and box locations, locations of conduit <br />crossings of Old Highway 8, construction phasing, and temporary service. We prepared <br />an exhibit to assist in easement coordination. <br />• Service to development west of Old Highway 8. <br />+ Avoidance of existing underground Qwest duct bank. We have attended a field meeting <br />to verify duct depth at potential conflict locations. <br />• Relocation of existing 8" Xcel Energy gas main. <br />Task 5 -Meetings <br />At the request of City staff, we have attended the following additional meetings not included in <br />. the original scope of work: <br />I . Meeting with Ramsey County (1) <br />2. Meeting with Rice Creek Watershed District (1) <br />3. Meetings with private utilities (3) <br />4. Design review/progress meetings with City staff (3 additional, including one final design <br />meeting to be scheduled) <br />See Task 9 for additional meetings during construction. <br />Task 6 -- Complete Storm Sewer Redesign <br />Our original scope of work assumed that design of new storm system would not be required. <br />Upon preliminary investigations into the capacity of the three separate existing storm sewer <br />systems, it was determined that a complete redesign of the existing system would be required to <br />accommodate the drainage needs of Old Highway 8. We have designed new storm sewer for Old <br />Highway 8 within the project limits to meet a 10-year design event. <br />Task 7 -Northwest Parkway <br />We have incorporated the design of Northwest Parkway 350 feet +/- east of Old Highway 8 into <br />the construction plans. As a part of this task, we addressed the horizontal alignment, profile <br />grade, storm sewer design, and interim construction issues associated with the design of this <br />roadway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.