My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 102
NewBrighton
>
Council
>
Resolutions
>
Resolutions 1965
>
Resolution 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2008 7:45:48 AM
Creation date
6/24/2008 11:51:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ .j~.J:' . .., ~ ~ <br />. < <br /> , ~ <br />.. .. .;' . ;';'.J. <br /> . <br /> RESOL UTION NO. /OcZ <br /> VILLAGE OF NEW BRIGHTON <br /> COUNTY OF RAMSEY <br /> STA TE OF MINNESOTA <br /> RESOLUTION DECLARING COST TO BE ASSESSED AND ORDERING PREPARATION <br /> OF PROPOSED ASSESSMENT AND CALLING HEARING ON PROPOSED ASSESSMENTS <br /> ON IMPROVEMENTS 63-10; 64-1,2,3,4,5,6,7, 12, 13, 14, 15, 16,18 and 20. <br /> BE IT RESOLVED by the Village Council of the Village of New Brighton, Minnesota, <br /> as follows: <br /> WHEREAS, a contract has been let for the improvements hereinafter described: <br /> IMPROVEMENT 63-10 <br /> Project 1. This project consists of grading, construction of sanitary sewer, water- <br /> main, storm sewer, gravel base, bituminous surfacing and concrete curb and gutter <br /> on the following streets: <br /> Foss Road from Patton Road to SUtte Highway No. 8 <br /> (8th Ave. N.. W. ) Imperial Lane from Foss Road to West End <br /> Continental Drive to Imperial Lane to East End <br /> 13th Ave. S. E. from Continental Drive to East End <br /> Rolls Road from Continental Drive to West End <br /> 7th St. S. W. from Continental Drive to East End <br /> County Road' "D" from Continental Drive to state Highway No. 8 (8th Ave. ) <br /> Project 2. This project consists of construction of sanitary sewer and watermain <br /> on the following streets: <br /> State Highway No. 8 from 14th St. to North Village Limits <br /> 14th St. from state Highway No.8 to Cleveland <br /> Cleveland Ave. from 14th St. to State Highway No. 8 <br /> Project 3. This project consists of grading and construction of watermain, bituminous <br /> surfacing and concrete curb and gutter on the following streets: <br /> 11th Ave. N. W. from 7th st. to 8th street <br /> Project 4. This project consists of grading, construction of sanitary sewer and water- <br /> main, storm sewer, bituminous surfacing, concrete curb and gutter on the following <br /> streets: <br /> Patton Road (Highcrest) from Foss Rd. to 3rd St. SW <br /> Oakwood Drive from Foss Rd. (Orchard Lane) to Haines Ave. <br /> Foss Road (Orchard Lane) from Patton (Highcrest) to Silver Lake Road <br /> Silver Lake Rd. from FQss Rd. (Orchard) to County Road "E" <br />
The URL can be used to link to this page
Your browser does not support the video tag.