My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECA 04-06-1988
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
AGENDAS
>
1988
>
PRECA 04-06-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 1:11:28 AM
Creation date
4/11/2007 2:09:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v- <br />.r <br />PHYLLIS R. HANSON, INC. <br />Registered Landscape Architect <br />MEMORANDUM <br />T0: Maury Anderson <br />FROM: Phyllis Hanson. <br />DATE: March 30, 1988 <br />SUBJECT: Innsbruck North in Relationship'to <br />Park Dedication <br />As per our meeting on Friday, March 26, 1988, which included Jeff <br />Shopek, engineer with Merila & Associates, Lnc., there are <br />several options for the- park dedication requirements on the <br />.Innsbruck North proposal. I would like to highlight these.- <br />options: <br />Option 1 (This is the option proposed by Harstad Companies.) <br />a. Harstad Companies would purchase the existing 3+/- acres of <br />park land (the gravel pit area) from the city. <br />b. Harstad Companies would dedicate 3+/- acres of park along the <br />south side of the. site. This area is wooded with <br />predominantly Bur and Red Oak hardwoods on the slopes and <br />sumac on the fringe. The topography is very hilly to steep; <br />slopes. <br />c. This site would then be developed into a passive neighborhood <br />park by Harstad Companies. The development would include <br />trails developed on existing "3-wheeler" paths. This would <br />minimize disturbance of the vegetation. Two .picnic/BBA sites <br />and a creative play/totlot area would also be part of the <br />development. <br />Option 2 <br />a. Swap city-owned park land for park land along the south side...- <br />It would need to be determined whether the land, area for <br />area and in value, is equal. <br />b. Park dedication requirements would include one half of the <br />development cost and one half. of the land (i.e. additional <br />easement between lots for access, 1 to 2+/- acres on the west <br />end). <br />• <br />7216 Boone Ave. N., Suite ItE 75 Brooklyn Park, MN 55428 Ph: (612) 533-5435 <br />
The URL can be used to link to this page
Your browser does not support the video tag.