My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4-19-05
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Minutes-Board Or Commission PLZ 00900
>
2005
>
4-19-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2007 1:54:01 PM
Creation date
5/24/2007 1:54:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Not Approved <br />Warehouse site). The proposed subdivision is minor in importance but does affect the <br />proposed site plan for three story office and residential condominium project proposed <br />for the site. Public hearing notice was sent to surrounding properties and notice was <br />published in the New Brighton Bulletin. <br /> <br />The Certificate of Survey shows two new lots being created. Lot 1 is proposed to be part <br />of a new Applewood Pointe of New Brighton Plat (United Properties) and will remain <br />with the applicant. “Outlot A” is being sold by United Properties to the New Brighton <br />Office Building site developers. “Outlot A” is 11, 919 square feet in area and is proposed <br />to be conveyed and joined with the parcel to the south owned by Red Stone Home <br />Builders at 1820 Old Highway 8 NW (former Hubcap Warehouse site). <br /> <br />Mr. Boylan expressed concern regarding a sewer/storm water pipe that cuts across the <br />property and is close to the proposed new office. The City is requesting that the pipe be <br />moved and an easement be granted to the City allowing access to the infrastructure. <br /> <br />Mr. Boylan recommended striking the two staff recommendations regarding this permit. <br />They will be addressed with the next Public Hearing agenda item. <br /> <br />CLOSE THE PUBLIC HEARING. <br />Motion by Schiferl, Second by Mann to <br /> <br />MOTION CARRIED. <br />6 Ayes, 0 Nays. <br /> <br />WAIVE THE READING AND ADOPT THE <br />Motion by Zisla, Second by Baker to <br />ATTACHED RESOLUTION APPROVING LP04-07 AND PL04-04, without <br />conditions. <br /> <br />MOTION CARRIED. <br />6 Ayes, 0 Nays. <br /> <br />Public Hearing: SP05-09 Special Use Permit and Site Plan Review <br /> <br />Consideration of a special use permit and site plan review applications for a four-story <br />building located at 1820 Old Highway 8 NW (former Hubcap Warehouse site). The <br />applicant is proposing to construct a 4-story building that exceeds height restrictions for <br />the MX, Mixed Use district. The bottom three floors will be offices and the top floor will <br />be apartments. <br /> <br />Mr. Boylan re-expressed the staffs concern regarding a sewer/storm water pipe that cuts <br />across the property and close to the proposed new office. The city is requesting that the <br />pipe be moved and an easement be granted to the City allowing access to the <br />infrastructure. <br /> <br />Greg Chaffin, Red Stone Home Builders, addressed the commission stating their <br />company has worked closely with United Properties and would be sharing a storm water <br />pond. He also answered questions regarding site subsurface contamination, orientation of <br />I:\COMMISSIONS\PLANNING\Minutes\2005\4-19-05.doc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.