My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 02-10-2009
NewBrighton
>
Council
>
Packets
>
2009
>
2009 Council Work Session Materials
>
WS 02-10-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 6:59:42 PM
Creation date
2/6/2009 3:43:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOCKRIDGE <br />GRINDAL <br />NAUEN <br />P, L . L . P . <br />Attorneys at Law <br />Transportation/Infrastructure Client Successes <br />The LOCKRIDGE GRINDAL NAUEN P.L.L.P. Federal Relations Group creates value by <br />applying proven strategies to realize success and advance client objectives. We work closely with <br />each client to develop a unique and focused strategic plan with clear objectives and measured <br />outcomes. Our experience has led to proven results for our clients, including successful efforts <br />to direct targeted federal infrastructure and community-based development dollars, influence <br />distribution formulas, insert legislative and report language, and obtain regulatory relief. Our <br />goal is always to provide a solid return on investment. Notable successes include the following: <br />INTERSTATE HIGHWAY BRIDGE PROJECT: The LOCKRIDGE GRINDAL NAUEN P.L.L.P. <br />(LGN) Federal Relations Group was retained by a coalition of local governments and <br />community based organizations to assist in securing federal bridge funding and to help move the <br />project up the priority listings for the state's Department of Transportation. LGN was successful <br />in securing targeted appropriations funding and federal designation in the TEA -21 <br />transportation authorization bill. These efforts helped improve the project's position on the <br />state's priority list and resulted in moving the bridge ahead 10 years on the DOT's build list. <br />TRUNK HIGHWAY PROJECT: A small community client was faced with the need to expand and <br />improve a main thoroughfare running through the heart of their downtown. LGN has been <br />able to secure $9.4 million in funding from FY2004-FY2009. The funds were used and continue <br />to be used for construction and design of a Midwestern Trunk Highway to aid in significant <br />congestion relief and subsequent economic development. <br />REGIONAL RAIL PROJECT. LGN was able to secure $1 million for rehabilitation work for a <br />regional shortline railroad. The funds assisted in rail improvements and significant benefits to <br />shippers along the rail line as well as progress several integrated multi -modal transportation and <br />economic development projects in the region. <br />TRANSPORTATION CORRIDOR DESIGN: Secured $500,000 in federal funds to pay for traffic <br />studies near a planned retail development, necessary for the eventual creation of a frontage road <br />to divert and control traffic congestion. Additionally, the funds dismissed lawsuits from <br />competing developers which claimed the city had not adequately studied the traffic impacts <br />before approving the development. <br />ENERGY LOAN GUARANTEE: LGN assisted an upper Midwestern client in securing an $800 <br />million loan guarantee in federal energy legislative authorization. <br />
The URL can be used to link to this page
Your browser does not support the video tag.