My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-02-25
NewBrighton
>
Council
>
Minutes - City Council
>
Minutes 1982
>
1982-02-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2005 1:55:37 PM
Creation date
9/14/2005 12:03:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I~'JI..',~" '. <br /> <br />I <br /> <br />1 <br /> <br />1 <br /> <br />City of New Brighton <br />February 25, 1982 <br /> <br />Gene Stokes, 733 Redwood Lane, asked how <br />the costs for the project were broken down <br />and what was considered to be the most <br />important element of this project. <br /> <br />Les Proper, City Engineer, stated that <br />approximately $133,000 were for street <br />construction and about $85,000 was for <br />curb and gutters and that in his opinion <br />both projects were equally important. <br />Mr. Proper stated that the concrete curbing <br />proposed is far better for drainage and <br />much less costly in terms of overall maintenance. <br /> <br />Mr. Stokes asked how the assessments were <br />to be paid. <br /> <br />The City Engineer replied that the payments <br />would be spread over perhaps a ten year <br />period or could be paid off immediately to <br />avoid any interest penalty. <br /> <br />Mrs. Ramona Christiansen, 825 Forest Dale Road, <br />questioned what assurances there were that the <br />project as proposed would be successful. <br />Mrs. Christiansen replied that everyone had <br />lived for many years with this problem and <br />that the main concern was that the project <br />be done right. <br /> <br />The City Engineer stated that he felt confident <br />that with concrete curb and gutters that the <br />water flow could be controlled and the project <br />a success. <br /> <br />Mrs. Christiansen questioned what the recourse <br />would be if the project were not successful. <br /> <br />The City Engineer replied that if the project <br />were not successful it would have to be redone. <br /> <br />Mrs. Christiansen asked if the driveways removed <br />and temporarily replaced last summer would be <br />permanently replaced with concrete at this time. <br /> <br />The City Engineer replied that those temporary <br />driveways would be redone with a permanent <br />concrete surface. <br /> <br />Harvey Evert, 862 Redwood Lane, stated that he <br />was also concerned with driveway replacement. <br /> <br />Mr. Don Erickson, 900 Redwood Lane, stated his <br />concern was for the end result and also stated that <br />he was very much in favor of this project. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.