My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-08-24
NewBrighton
>
Council
>
Minutes - City Council
>
Minutes 1982
>
1982-08-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2005 2:00:42 PM
Creation date
9/14/2005 12:28:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I. <br /> <br />I <br /> <br />I <br /> <br />"lOuche Ross [~Gl <br /> <br />VIII. PROPOSED IMPLMENTATION PLAN <br /> <br />Critical Decision Point <br /> <br />Discontinue project <br />. Proceed with Phase II <br /> <br />. <br /> <br />Phase II New Brighton Waste-to-Energy District Heating Study <br /> <br />Evaluate and minimize project risks <br /> <br />Hold public meetings to lessen risk of public disapproval <br />Meet with public agencies such as the Pollution Control <br />Agency, the Environmental Protection Agency, the <br />Environmental Quality Board, the Highway Department and <br />others to determine needed permits <br />Negotiate with potential stearn consumers to determine <br />actual steam sales possible <br />Negotiate with NSP to determine price to be paid for <br />electricity <br />Initiate negotiations with transfer stations and garbage <br />haulers to determine the quality, availability, and <br />fluctuations in delivery of MSW <br /> <br />Initiate contact with potential equity owners and financiers <br />to determine their requirements for committing capital <br />Revise financial projections to incorporate the results of <br />the above activities . <br />Make go/no go decision to proceed with final design and <br />feasibility <br /> <br />. <br /> <br />Phase III New Brighton Waste-to-Energy District Heating study <br /> <br />Finalize legal structure of the entity <br />Qevelop final design/bid package and select contractor <br />Negotiate with contractors/engineers <br />Revise financial projections <br />Solicit financing <br />Initiate contractual arrangements with consumers of plant <br />outputs and MSW providers <br />Begin construction <br />Hire plant manager <br />Hire labor <br />Begin operations <br /> <br />- 25 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.