My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-12-2009
NewBrighton
>
Council
>
Packets
>
2009
>
CCP 05-12-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 10:54:26 PM
Creation date
5/8/2009 3:01:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />APR, 30. 2009 9:10AM INFRATFCH 7634286489 N0. 087 P. 4 <br />In <br />VV <br />VA --.--Of <br />the dty that works for you <br />April. 16, 2009 <br />Infratech Technologies, Inc <br />21040 Commerce Blvd <br />Rogers MN 55374-9341 <br />John Selvog, Vice president <br />763428-6488 <br />FAX 763-428-6489 <br />INFM- W <br />The City ofNew Brighton Public Works Department is requesting a price quotation for the work <br />listed below. If you are interested in quoting prices please return by fax to: 651-638-2174 or by <br />mail to, Dave Olson, Superintendent of Public Works, 700 5`h St NW, New Brighton MN 55112. <br />Quotations are to be completed and returned, by Friday, May 1, 2009 at 1.00 pm. All prices to <br />remain the same for one year from date of acceptance of quote. <br />Sealing of pipes with short liners: $1 , 550.09)er liner up to 6 foot <br />$1,550.00 + $1 per liner larger than 9 foot <br />-&s o 0 . Q o per wye reinstatement <br />Approximately 17 short liners — all are 6' and less. Install short liner with a cured in place <br />process of polyester felt material saturated with a thermosetting resin and inserted into <br />existing sewer lines. In accordance with the American Society for resting and Materials <br />(ASTM} standards such as F-1216, D-638, & D-7.90, It is the responsibility of the installer <br />to clean the lime prior to short lining, After the pipe has been reconstructed, existing service <br />connections in the repaired area will be reconnected, without excavation, 'Upon completion, <br />a video tape showing the completed work including the restored conditions and a written <br />report of corrections and procedures will be famished. <br />TOTAL cost of 17 short liners <br />$250.00 <br />If you have any questions regarding the above work please contact Dave Olson, Superintendent of <br />Public Works at 651-638-2113 or Kim Otis, Public Works Office Assistant 651-638-2111. <br />().\P W.Mainteno%;v\5fnilaty SewoATEUVISE12000\24W11 quote foml - lnfrxah T"h-192igI IT,doo <br />
The URL can be used to link to this page
Your browser does not support the video tag.