My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-12-2009
NewBrighton
>
Council
>
Packets
>
2009
>
CCP 05-12-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 10:54:26 PM
Creation date
5/8/2009 3:01:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />of <br />the city that works for you <br />April 16, 2009 <br />Midwest Trenchless Technologies 952-873-3292 <br />25648 200" St FAX: 952-873-3112 <br />Belle Plaine MN 56011 <br />The City of New Brighton Public Works Department is requesting a price quotation for the work <br />listed below. If you are interested in quoting prices please return by fax to: 651-638-2174 or by <br />mail to: Dave Olson, Superintendent of Public Works, 700 51" St NW, New Brighton MN 55112. <br />Quotations are to be completed and returned by Friday, May 1, 2009 at 1:00 pm, All prices to <br />remain the same for one year from date of acceptance of quote. <br />Sealing of pipes with short liners: 16HZ per liner up to 6 foot @ �" Dw,-YoAt�- (;V3 <br />;2d °° per liner CZ ►a" V,w*.Y \,r (" U,Y.. - ) <br />-30— per wye reinstatement <br />Approximately 17 short liners -- all are 6' and less, install short liner with a cured in place <br />process of polyester felt material saturated with a thermosetting resin and inserted into <br />existing sewer lines. In accordance with the American Society for Testing and Materials <br />(ASTM) standards such as F-1216, D-638, & D-790. It is the responsibility of the installer <br />to clean the line prior to short lining. After the pipe has been reconstructed, existing service <br />connections in the repaired area will be reconnected, without excavation. Upon completion, <br />a video tape showing the completed work including the restored conditions and a written <br />report of corrections and procedures will be furnished. <br />TOTAL cost of 17 short liners $ <br />If you have any questions regarding the above work please contact Dave Olson, Superintendent of <br />Public Works at 651-638-2113 or Kim Otis, Public Works Office Assistant 651-638-2111. <br />G:�PW-Ma+go=cc%SanitarySeweATFLEVISE\200Moo9cm,i. i6Nrr•-u"- <br />r. <br />
The URL can be used to link to this page
Your browser does not support the video tag.