My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-12-2009
NewBrighton
>
Council
>
Packets
>
2009
>
CCP 05-12-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 10:54:26 PM
Creation date
5/8/2009 3:01:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Of <br />� �NEVV <br />' ``MGH" <br />• <br />the city that works for you <br />April 16, 2009 <br />Visu-Sewer Clean & Seal, Inc <br />7905 Beech Street NE <br />Fridley MN 55432-1762 <br />Ron Fenney, General Manager <br />763-252-0004 <br />FAX: 763-252-0008 <br />The City of New Brighton Public Works Department is requesting a price quotation for the work <br />listed below. If you are interested in quoting prices please return by fax to: 651-638-2174 or by <br />mail to: Dave Olson, Superintendent of Public Works, 700 5th St NW, New Brighton MN 55112. <br />Quotations are to be completed and returned by Friday, May 1, 2009 at 1:00 pm. All prices to <br />remain the same for one year from date of acceptance of quote. <br />Sealing of pipes with short liners: .41-70 t-0- per liner up to 6 foot <br />per liner larger than 9 foot <br />goo '+' per wye reinstatement <br />Approximately 17 short liners — all are 6' and less. Install short liner with a cured in place <br />process of polyester felt material saturated with a thermosetting resin and inserted into <br />existing sewer lines. In accordance with the American Society for Testing and Materials <br />(ASTM) standards such as F-1216, D-638, & D-790. It is the responsibility of the installer <br />to clean the line prior to short lining. After the pipe has been reconstructed, existing service <br />connections in the repaired area will be reconnected, without excavation. Upon completion, <br />a video tape showing the completed work including the restored conditions and a written <br />report of corrections and procedures will be furnished. <br />TOTAL cost of 17 short liners <br />$ <br />If you have any questions regarding the above work please contact Dave Olson, Superintendent of <br />Public Works at 651-638-2113 or Kim Otis, Public Works Office Assistant 651-638-2111, <br />GAM-Maintenance\Sanitary Sewer\TELEVISE\2009\2009 quote form- Visu-Sewer Clean.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.