My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 07-14-2009
NewBrighton
>
Council
>
Packets
>
2009
>
2009 Council Work Session Materials
>
WS 07-14-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 7:36:41 PM
Creation date
7/10/2009 2:06:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Janice Gundlach, City of New Brighton <br />From: Andrew Skoglund, Barr Engineering Company <br />Subject: Review of Noise Mitigation Documents for Belaire Excavating's Facility <br />Date: February 13, 2009 <br />Project: 23/62-1007 <br />c: Dan Fetter <br />discernable at surrounding receptors. Impulsive noise of this type is not well captured by the standards <br />assessed, and may be more of a nuisance than a violation of noise standards. <br />The existing facility appears to be within compliance with Minnesota Noise Standards. The suggested <br />mitigation plan is likely to minimize the impact of the facility upon the overall noise level. However, <br />reduction of the overall level does not necessarily mean the facility will be inaudible, especially impulsive <br />sounds like a tailgate banging on the bed of a truck. <br />While the proposal to reduce the facility's overall noise level below existing background is likely to <br />improve conditions. without octave band monitoring data it is not certain that the facility is or is not in <br />compliance with New Brighton's Zoning Code. <br />• <br />C7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.