Laserfiche WebLink
August 11, 2C <br />(MVHC) Revenues from the State of Minnesota. Report No. 09-193. Resolution No. 09-045. <br />7. Consideration ofApplication for a Solicitor License — APX Alarm Security Solutions, Inc. <br />Report No. 09-194. <br />8. Consideration of Request for Exemption from Lawful Gambling License — New Brighton Eagles <br />Auxiliary #3718. Report No. 09-195. <br />• Council Business <br />1. Consideration of Project 09-9, Old Highway Watelmain UpWade and Approval of plans and <br />Spec's and Authorization to Advertise for Bids. Report No. 09-197. <br />Director of Public Works Grant Wyffels introduced Mark Kasma representing Bolton & Mertk, Inc. <br />Director Wyffels explained currently, the only watermain servicing the entire NE portion of the <br />City is an 8 -inch cast iron watermain. Given our current system demand from the industrial <br />park located north of Highway 96,`a new hotel at Highway 96 opening this December, and the <br />future water demand of the, Northwest Quadrant area, it is strongly recommended the 8 -inch <br />pipe be upgraded to a 12 -inch pipe. As part of the Old Highway 8 Reconstruction project, a <br />12 -inch watermain was constructed from 1-694 and extended past the Long Lake Regional <br />Park entrance. This project will connect to the new 12 -inch near the park entrance and 2,800 <br />linear feet of watermain will be directionally drilled along the west side of Old Highway 8 to <br />south of Applewood Point just north of Highway 96. The new 127 unit hotel currently under <br />construction and scheduled to open this December, will not be put out of service by <br />constructing this watermain in the fall of 2009. The remainder of the loop will be coordinated <br />with future construction projects. <br />Also, included in this project is the construction of an access trail to the existing sanitary <br />sewer. Councilmember Burg questioned if the proposed trail was shared with the Trails <br />Committee. Director Wyffels reported the trail Committee was very pleased with the <br />proposal. The time frame was reviewed, completion would be expected October 30, 2009. <br />• <br />Motion by Couneffinember Burg, seconded by CouncUmember Bauman to approve project 09-9. <br />09 Page 3 of 5 <br />Unallotimtt of Luer <br />Government Aid (LGA <br />(MVHC) Revenues fton <br />the State of Minnesot <br />Report No. 09-193. <br />Resolution No 09-045. <br />7. Consideration c <br />Application for a Solicitc <br />License — APX Alam <br />Security Sohaions, hx <br />Report No. 09-194. <br />8. Wisideration of Roque <br />for Exemption from Lawfi <br />Gambling License — No, <br />Brighton Eagles Auxiliar <br />#3718. <br />Report Na 09-195. <br />9.Cansidetation of Renews <br />Application for Pubb <br />Ptentise Liq" Uce se <br />Jake's Sports Cafe <br />Repent No. 09 196. <br />Public Hearing <br />None <br />Council RUM <br />1.. Conskkration of <br />Project094, Old Highway <br />watemiain upgradeand <br />Approval of fans and <br />Spec's and Authorization a <br />Advertise far $ids. <br />Repeat No. 09 197. <br />