July 26, 2011 Page.5 of _.. _.. <br />If awarded, the contract requires project completion by October 31, 2011. <br />Director Wyffels explained the there be an opportunity to reduce costs, as PVC piping is less expensive <br />than ductile iron. <br />This project will be funded from a combination of City of New Brighton general taxes, Municipal State <br />Aid funds, special assessments, and utility enterprise funds. <br />Councilmember Burg questioned how PVC and ductile compare. Director Wyffels stated ductile has a <br />very good track record, as well as PVC. It was noted that ductile is easier to locate. <br />Councilmember Phillips commented that he is not in favor of negotiated deducts, and would be in <br />agreement with using the ductile iron. <br />Councilmember Burg questioned the long term effects of both the PVC and ductile, specifically tree <br />-- roots. Director Wyffels root problem occur more insewerlines than in water main lines. <br />Motion by Councilmember Phillips, seconded by Councilmember Samuelson to accept the bids and <br />adopt the attached resolution awarding a contract for City Project 11-1, 2011 Street <br />Rehabilitation to the lowest responsible bidder, Hardrives, Inc., in the amount of $1,089,257.30, <br />and authorize staff to negotiate deduct changes as appropriate. <br />5 Ayes, 0 Nays - Motion Carried <br />5. Consideration ofResolution Accepting Bids and Awarding a Contract for Project 11-3, 2011 <br />Pavement Management Program and Project 11-8, New Brighton Community Center Patidng <br />'Lot. ReportNo. 11-209. Resolution No. 11-076. <br />City Manger Lotter noted this item is part of a recently negotiated agreement between the City <br />of New Brighton and Ramsey County. <br />Craig Schlichting, Engineer repotted the following eight bids were received: <br />Peterson Companies, Inc. $324,550.98 <br />Belair Excavating $346,467.02 <br />Ace Blacktop, Inc. $353,995.60 <br />Frattalone Companies, Inc. $377,745.51 <br />Sunram Construction, Inc. $378,551.00 <br />Midwest Asphalt Corp. $399,363.25 <br />Buck Blacktop, Inc. $399,796.14 <br />Bituminous Roadways, Inc. $423,884.30 <br />The low bid of $324,550.98 was submitted by Peterson Companies, Inc. is 5.2 percent above the <br />engineer's estimate of $308,620.85. <br />City Project 11-3 consists of the following: 1) The removal and replacement of the bituminous <br />surfacing in Hansen Park along with the addition a bituminous trail connection to the existing <br />neighborhood shelter, and the installation of a biofiltration basin. 2) The relocation of the Silver Oaks <br />Park hard court. 3) An overlay for the hard court and trail at Vermont Park. <br />City Project 11-8 includes the construction of 51 additional parking stalls, a concrete sidewalk, and <br />storm water improvements to meet Rice Creek Watershed District requirements. As a part of the <br />discussions with PREC, parking lot lighting, wider concrete sidewalks, and additional pedestrian curb <br />'ramps were added to this project. This added some additional cost that was not provided for in the <br />original cost estimates. <br />The bids are consistent with the engineer's estimate, with the exception of the storm water <br />improvements as part of City Project 11-3. To meet current storm water improvement guidelines, <br />5. Considemon of <br />Resolution Aaepang <br />BidsaxlAwmdinga <br />Con= for Project 11- <br />3, 2011 Paveaw <br />MmagmrntRo rmn <br />and Pmjext 11-8, New <br />Bn&m Convnunity <br />Certai,mi&gl.ot. <br />RepwtNo.11-209. <br />Resolution % 11-076 <br />