Laserfiche WebLink
waveguide and appurtenances to be attached to Lessor's existing water tower, all as <br /> depicted on Exhibit B. Lessee, at its sole cost and expense, also shall have the right to <br /> test, survey and review title on the Property; perform and obtain soil borings, <br /> percolation tests, engineering procedures, environmental investigation or other tests or <br /> reports on, over, and under the Property, necessary to determine if Lessee's use of the <br /> Premises will be compatible with Lessee's engineering specifications, system, design, <br /> operations or necessary permits or approvals. Lessee shall not modify, supplement, or <br /> expand the equipment, or increase the number of antennas, or relocate the Facility <br /> within the Premises in any way that is inconsistent with the facilities depicted on Exhibit <br /> B without the written consent of Lessor. <br /> The Facility consists of a tower mounted antenna system and ground space for <br /> an equipment shelter as shown on Exhibit B, including all necessary connecting <br /> appurtenances sufficient to be a fully operable communications facility for its intended <br /> licensed communications coverage areas. This may include, radio transmission and <br /> computer equipment, batteries and generator equipment. All improvements shall be at <br /> Lessee's expense. Lessee shall maintain the Premises in reasonable condition. <br /> In addition, in the event of a natural or manmade disaster, in order to protect the <br /> health, welfare, and safety of the community, Lessee may erect additional <br /> telecommunications facilities and install additional equipment on a temporary basis on <br /> the Property to assure continuation of service. Such temporary operation shall not <br /> exceed 90 days unless written approval is obtained from the Lessor. <br /> Lessee hereby consents to the use of Lessor's Property by one or more <br /> additional communication providers for the erection, operation and maintenance of a <br /> transmission facility (including an antenna structure) so long as (a) Lessor provides not <br /> less than 30 days' prior notice to Lessee of the erection of such facility together with <br /> facility specifications for Lessee's approval, (b) the erection, maintenance and operation <br /> of such transmission facility shall not result in any impairment or diminution in the <br /> quality of the communications service rendered by Lessee to or from the Property, and <br /> (c) no changes shall be made to the antenna structure of such other provider without 30 <br /> days' prior written notice to Lessee for Lessee's approval. Lessor shall not permit any <br /> other provider to change equipment if such change is determined by Lessee to be likely <br /> to cause interference with Lessee's communications service. If Lessee deems, in its <br /> sole discretion, that the provisions of this section have been violated by Lessor or such <br /> other provider, Lessee shall provide Lessor with notice of such violation. If any violation <br /> is not cured or mitigated (at no expense to Lessee) within 24 hours of receipt of such <br /> notice, Lessor shall cause such other provider to immediately cease use of its radio <br /> system, or portion thereof causing such interference, until such time as the interference <br /> is cured. Lessor shall require that any agreement with such other provider shall include <br /> a provision requiring compliance by such other provider with the provisions of this <br /> section. If the other provider is granted approval to use the Property for <br /> communications purposes and thereafter Lessee's use of the Property is materially <br /> adversely affected, Lessee shall provide Lessor with notice of such interference. If <br /> such interference is not cured or mitigated (at no expense to Lessee) within 24 hours of <br /> 4 <br />