My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PC Packet 08-21-2012
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
PC Packets
>
2012
>
PC Packet 08-21-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 7:33:02 AM
Creation date
10/14/2014 10:18:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A new transit market area was added, for a new total of 5 transit market areas.These <br /> geographic market areas and the typical services provided in them are shown on Fig 7- <br /> 19 and described in the plan as well as in Appendix G, Regional Transit Standards. <br /> • Appendix G, Regional Transit Standards and Appendix H, Park and Ride Plan, have been <br /> updated since 2004. <br /> • Northstar commuter rail was opened in November 2009. <br /> • The updated TPP shows a more recent map of existing bus routes and facilities than was <br /> shown in the 2004 plan. Cities should be aware that bus routes are subject to periodic <br /> change, depending on ridership and funding availability. <br /> • Several maps show potential new bus routes for local service, arterial service and <br /> express service by 2030 which will require further planning and funding resources <br /> before they are implemented;therefore cities are not expected to show these in their <br /> local comprehensive plans at this time. <br /> Aviation System Plan Changes since 2004: <br /> • Fig. 10-1 shows the regional aviation system. Search Area A in northwest Hennepin <br /> County has been removed from the plan as future forecasts no longer indicate demand <br /> for an airport in this area. <br /> • The 2010 TPP incorporates the first new forecasts and Long Term Comprehensive Plan <br /> (LTCP) update for MSP International airport since the 1996 TPP. It also acknowledges <br /> updated LTCPs for six of the reliever airports which are owned and operated by the <br /> Metropolitan Airports Commission (MAC). <br /> • Appendices 1-0 have been added with additional detail on aviation plans and topics. <br /> Other Plan Changes <br /> • Chapter 4: Transportation and Land Use has been expanded to include policies and <br /> strategies to coordinate transportation investments and land use. <br /> • Chapter 5: Regional Mobility describes how better management and more efficient use <br /> of existing transportation system capacity, pavement, and right-of-way, along with <br /> strategic capacity expansions can be used to address system wide traffic congestion. <br /> • Chapter 8: Freight and Goods Movement acknowledges the multimodal freight <br /> movement system that connects the region to the rest of the nation and the world. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.