Laserfiche WebLink
As discussed in the Site Plan and PUD Analysis sections of this report, the applicant prepared a <br />Site Plan that included pedestrian linkages to neighboring developments and a pedestrian <br />friendly streetscape and enhanced landscape plan. The applicant has also incorporated a <br />building placement that fits well with the adjacent right-of-way and has created a great deal of <br />visual character with the large amount of class, a varying color scheme, and a courtyard, all <br />qualities of which are consistent with this criterion. <br /> <br />(3) The extent to which the proposed uses will be compatible with present and planned uses in <br />the surrounding area. <br /> <br />Staff finds this criterion is met. The proposed office use and on-site improvements will be <br />compatible with future land uses. <br /> <br />(4) That the design of the development justifies any exceptions to the standard requirements of <br />the Zoning Code. <br /> <br />Several deviations from the underlying zoning district standards are requested and have been <br />identified in the Site Plan analysis section of the report. Based on the sidewalk connection and <br />enhanced landscape plan staff finds this criterion to be met. <br /> <br />(5) The sufficiency of each phase of the planned development size, composition and arrangement <br />in order that its construction, marketing, and operation is feasible without dependence upon any <br />subsequent unit. <br /> <br />The Site Plan will be developed in a single phase. A future expansion of up to 12,200 SF has <br />also been identified. Separate land use approvals will be required at the time the expansion <br />space is to be constructed, including Site Plan and PUD approval. <br /> <br />(6) The burden or impact created by the planned development on parks, schools, streets, and <br />other public facilities and utilities. <br /> <br />The proposed development will have little impact on parks, schools, streets, and other public <br />facilities and utilities. Impacts to streets and utilities will be the greatest; however the traffic <br />impacts will likely be negligible with only 1-2 truck to the site per day. The applicant indicates <br />the building will support 55 employees (100 at full build-out), traffic impacts of which are <br />appropriate for the existing roadway system. Lastly, all utilities, including storm water ponding, <br />have been planned and built based upon a building of at least 60,000 SF. <br /> <br />(7) The impact of the planned development on environmental quality and on the reasonable <br />enjoyment of surrounding property. <br /> <br />Staff finds this criterion to be met. The New Brighton Exchange redevelopment area has always <br />planned for corporate office users, and the impact to environmental quality and reasonable <br />enjoyment of surrounding property will not be negatively impacted. In fact, the area will be <br />enhanced with the development of this property. <br /> <br />Commencement & Compliance Dates <br />In addition to the PUD standards and criteria of Sections 7-230 & 7-240, Section 7-250 requires <br />establishment of commencement and compliance dates. The commencement date is the date by