Laserfiche WebLink
7. The Landscape Plan shall be revised whereby all trees are moved west outside the <br />roadway easement area. <br />8. The City Engineer reviews and approves a Grading, Drainage, Utility, and Erosion <br />Control Plan, prepared by a licensed Civil Engineer, prior to release of a building permit. <br />9. Separate Permanent Sign Permits must be obtained and all signs must comply with the <br />requirements of Zoning Code Section 9-070. <br />10. Prior to release of a building permit, the applicant submits a Photometric Plan illustrating <br />compliance with Zoning Code Section 11-020(6). <br />11. Incorporation of the recommendations noted in the Interoffice Public Safety memo dated <br />6/6/2017 and Interoffice Engineering memo dated 6/15/2017. <br /> <br /> <br /> <br />Janice Gundlach <br />Assistant Director of Community Assets & <br />Development/Planning Director <br /> <br />