My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018.08.28 CC
NewBrighton
>
Council
>
Packets
>
2018
>
2018.08.28 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 3:22:02 PM
Creation date
2/14/2019 1:59:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minor Subdivision, SUP, and Site Plan Review; Silver Lake Smile <br />City Council Report; 8-28-18 <br /> <br /> <br />Page 10 <br />Storm water / <br />Grading / <br />Erosion: <br /> As a condition of approval, the following Engineering comments (also on the <br />memo dated 8/7/18) shall be addressed: <br />1. Add inlet protection to catch basin(s) Silver Lake Road and Palmer Drive (NE <br />corner) where dirt may track during construction. <br />2. Soils below infiltration basin not ideal for infiltration. Provide a maintenance <br />pipe from IB to rock swale with plug that can be removed when draw down is <br />required or during plant establishment period. <br />3. Rock swale will be unusable during winter, and the overflow is shown as <br />entering the BP site through the one way. Then the rock swale dumps over the <br />sidewalk on the south. The plans should include a concrete spillway at the <br />cross gutter exit and a concrete spillway connect the rock swale to the 33.60 <br />curb cut at the north. Civil to show route this water will take through BP site to <br />insure no adverse impacts are realized. Existing drainage entered BP site at <br />32.5, staff encourages applicant to use this route vs. over the sidewalk. <br />4. If sidewalk overflows are used, the plans must include concrete instead of rock <br />adjacent to the walk. <br />5. The overflow from the IB is labeled incorrectly, it should state 33.75 not 34. <br />The HWL for the IB is 934.41 and a 34.5 contour is shown. Grades along the <br />building at this location will equal the floor elevation so the plans should <br />indicate raising grade along this wall and waterproofing as required. <br />6. The ME elevations on C3 should be adjusted on the SW corner (three state <br />933.4 and none of them match what was surveyed). <br />7. Additional spot elevations need to be shown for eastern ADA ramp and the <br />overland flow to the east from 33.45 towards Palmer Drive. <br />8. Show discharge points for roof drains and how’/where they discharge. <br /> <br />Fire/Safety: As a condition of approval, all Public Safety comments on the memo dated 8/9/18 <br />shall be addressed which include the following: <br />1. Appropriately designed and rated separation wall between the proposed rental <br />space and primary business area. <br />2. Installation of a properly designed and approved building fire suppression <br />system <br />3. Installation of a Fire Department Connection at a location identified by the Fire <br />Marshal during a pre-construction meeting <br />4. Ensure facility and site lighting does not impact adjacent neighbors in Brighton <br />Square Townhomes
The URL can be used to link to this page
Your browser does not support the video tag.