Laserfiche WebLink
Special Use Permit – Bel Air Elementary <br />Planning Commission Report; 12-18-18 <br /> <br /> <br />Page 5 <br />(cont.)  The legal requirements, notices, and timing associated with a ROW vacation do <br />not match up with this SUP review. Rather than delay this project & analysis or <br />require special variances, staff is instead recommending that any approval be <br />conditioned on the school completing the vacation process in the coming months. <br /> <br />Proposed <br />Additions: <br /> Proposed areas of addition (blue) and renovation (orange) are as shown here. All <br />additions will meet required setbacks provided the noted ROW vacations are <br />ultimately completed. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Building <br />Materials: <br /> Materials to be used will largely match the existing school with some minor <br />updates to improve the building aesthetics. Biggest change will be the aluminum <br />composite paneling painted blue in certain areas as shown on the following page. <br /> New lettering for “Bel Air Elementary” will be metal. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />