Laserfiche WebLink
<br />2. Provide elevations and a detail of the sewer service connection at the lift station. <br /> <br />3. Concrete bollards will need to be installed to protect existing lift station and control cabinet. <br /> <br />Storm Sewer <br /> <br />1. The proposed storage rack shall not obstruct water flow from curb cut and rip rap located in the <br />cul-de-sac of 3rd Ave SE. <br /> <br />2. Plans must include erosion control information. Items like silt fence, a rock construction entrance, <br />bio-rolls, and revegetation specifications should be included. <br /> <br /> <br /> <br />