My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.04.21 Planning Commission
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2020
>
2020.04.21 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 10:57:35 AM
Creation date
2/16/2021 2:21:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Murlowski Industrial Park SUP Amendment, Site Plan Amendment, and Variance <br />Planning Commission Report; 4-13-20 <br /> <br /> <br />Page 7 <br />(cont.) To clarify, the existing outlet will only be abandoned once it is replaced in a spot <br />and alignment agreed upon by all interested parties. In the meantime, this process <br />will formally establish an easement over the oulet and stormsewer pipe which can <br />be vacated in the future if no longer needed. <br /> As the proposed changes will not result in the disturbance of any ground at the <br />present time, there is no need to amend or acquire a new NPDES or RCWD <br />permit. <br /> <br />Fire/Safety: Staff has no concerns about fire/safety vehicle access to this site as the large <br />equipment being used naturally ensures there are ample drive aisles available to <br />access all corners of the site. <br /> <br />Lighting: No changes proposed/required to lighting. <br /> <br />Signage No changes proposed/required to signage. <br /> <br />Parking: No new parking is proposed (or needed) with the proposed changes. <br /> <br />Sidewalks & <br />Trails: <br /> No new sidewalks or trails are proposed (or needed) with the proposed changes. <br /> <br />Project <br />Phasing: <br /> As no physical changes are proposed, there is no phasing associated with this <br />request. <br /> <br /> <br />Special Use Permit Review <br />In General: All site plan changes within the Environmental Constraint Overlay Area require an <br />SUP amendment. <br /> <br />SUP Standards <br />Review: <br /> <br /> <br /> <br /> <br /> <br /> <br />Issuance of an SUP amendment requires an analysis of the proposed use against the <br />specific review criteria established in code. Staff has reviewed the City’s criteria for <br />special use permits, and we offer the following analysis for consideration: <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.