My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.02.11 CC Packet
NewBrighton
>
Council
>
Packets
>
2020
>
2020.02.11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 9:46:02 AM
Creation date
2/28/2021 11:29:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651 645 4197 <br /> <br />provide recommendations for subgrade preparation and design of pavements, utilities, and <br />ponds. <br /> <br />Task 4 – Old Highway 8 and 8th Avenue Traffic Analysis <br /> <br />Kimley-Horn will perform a traffic analysis for the intersection of Old Highway 8 and 8th <br />Avenue NW. The traffic analysis will utilize existing intersection turning movement counts that <br />were collected before the construction of the I-35W MnPASS Project started. Historical crash <br />data available on the Minnesota Crash Mapping Analysis Tool will be reviewed at the <br />intersection. The AM and PM peak hours will be modeled using Synchro/SimTraffic software <br />for the Existing 2019 Conditions, 2040 Background Conditions and 2040 Build Conditions. <br />The analysis results and crash data will be reviewed to recommend intersection configuration <br />at the intersection of Old Highway 8 and 8th Avenue NW, consideration will be given for the <br />potential four-lane to three-lane conversion. A memorandum summarizing the findings of the <br />analysis will be prepared and included as an appendix to the preliminary engineering report. <br />In addition to the memorandum, a Signal Justification Report will be prepared for the <br />intersection of Old Highway 8 and 8th Avenue NW. <br /> <br />Task 5 – Final Construction Plans and Specifications <br /> <br />Preparation of Final Construction Documents <br />We will prepare final construction plans that include plan and profile information for the <br />roadway, sidewalks, storm sewer/BMP, and traffic signal system improvements. The plans will <br />be prepared consistent with State Aid standards. We have assumed the following plan sheets <br />will be necessary: <br /> <br /> Cover Sheet <br /> Statement of Estimated Quantities <br /> Typical Sections and Details <br /> Alignment Plan <br /> Staging/Traffic Control <br /> Removals and Erosion Control <br /> Street and Storm Sewer Plan/Profile <br /> Stormwater BMP Grading/Details Plan <br /> Traffic Signal Plans <br /> Cross Sections (50’ Intervals and all Driveways) <br /> <br />We will provide the City plans at 60% and 95% completion for review and comment. Comments <br />will be addressed in the subsequent submittal. We have assumed submittal to State Aid will <br />occur at the 95% completion level. Final construction plans will be completed following <br />comments from State Aid, County, and City staff on the 95% plans and specifications. <br /> <br />Detailed Bid Items and Quantities <br />Upon completion of final design, we will provide the City detailed quantities and bid items for <br />the Old Highway 8 and 8th Avenue NW Intersection Improvements. Bid items and quantities <br />will be provided to the City of New Brighton for inclusion in their bidding documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.