Laserfiche WebLink
Site Plan Review: Totem Pole Park Rehabilitation <br />Planning Commission Report; 4-18-23 <br /> <br /> <br />Page 8 <br />(cont.)  To summarize the final improvements: <br />o A new parking lot will replace the parking spaces currently within the Foss <br />Road right-of-way. This new parking area is being appropriately sized (27 <br />spaces with two handicapped spaces) to accommodate the anticipated need of <br />these facilities in most instances. <br />o A full-sized basketball court (with seating) and a new “Bankshot” court <br />amenity will be provided. <br />o The neighborhood center building will be replaced by an open air shelter with <br />two restrooms (see below). <br />o To reduce costs, the existing playground equipment (only 8 years old) will be <br />relocated in accordance with the new plan. <br />o The tennis court will be replaced with four pickle ball courts. <br />o The ball field will be renovated into a full-sized field, and will include new <br />bench facilities as well as a spectator area behind home plate. <br />o New trails will connect the parking lot to all of the noted amenities above. <br /> <br /> <br />Bankshot Court Example Open Air Shelter (matching this one from Sunny Square Park) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />