Laserfiche WebLink
Special Use Permit Amendment – Global Academy <br />Planning Commission Report; 5-16-23 <br /> <br /> <br />Page 9 <br /> <br /> <br /> <br /> <br />Lilac Bushes / <br />Proposed Location <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Lot Access:  Access points to the site will not change. <br /> <br />Water <br />System(s): <br /> No water supply issues were identified for the new garage. <br /> <br />Sanitary <br />System(s): <br /> No sanitary sewer issues were identified for the new garage. <br /> <br />Storm water / <br />Grading / <br />Erosion: <br /> As a condition of approval, Global Academy must submit, with the building permit <br />application, details as to how boundary line improvements between this property <br />and the former seminary property to the north are intended to be handled (i.e. <br />grading, impervious removal, landscaping, etc). Engineering will review plans <br />from both applicants simultaneously to ensure all plans work in conjunction with <br />one another. <br /> Global Academy shall secure all necessary permits from the Rice Creek Watershed <br />District which address both this project and the on-going gym addition project. <br /> <br />Fire/Safety:  No concerns were noted by public safety. <br /> <br />Lighting:  Lighting, if added to the garage, is not to shine directly into the public right-of-way <br />or onto any residential use. As a condition of the SUP, the applicant shall be <br />required to correct any lighting problems that are identified following construction <br />(none are anticipated). <br /> <br />Signage  Any proposed signage would need to be permitted though the City’s separate sign <br />permit review process.