Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> interoffice <br />MEMORANDUM <br /> <br /> <br /> <br />to: Ben Gozola, Assistant Director of Community Assets and Development <br />from: Dustin Lind, Engineering Supervisor <br />subject: 600 Lakeview Point <br />date: July 11, 2023 <br /> <br />The Engineering Department has reviewed the site plan for the property at 600 Lakeview Point and we <br />offer the following comments: <br /> <br />Streets <br /> <br />1) A curb cut permit will be required for installation of the proposed driveway connection to Lakeview <br />Point. <br /> <br />Storm Sewer <br /> <br />1) The site plan includes installation of a new above ground fuel tank and fueling station. There is an <br />existing catch basin located near the proposed location that shall be protected (either by adjusting <br />site grades or by installation of a vented hood within the catch basin) to prevent spills from entering <br />the storm sewer system. <br /> <br />Easements <br /> <br />1) Existing easements around perimeter of site and over existing sanitary sewer, storm sewer, and pond <br />need to be shown. <br />