My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-031
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-001-100
>
LP-031
>
LP-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2006 12:37:50 PM
Creation date
11/6/2006 11:31:23 AM
Metadata
Fields
Template:
House File
Address
3000 5TH ST NW
House Number
3000
Street
5TH
Street Type
ST
Direction
NW
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'. <br /> <br />LP-31 -2- <br /> <br />2. That all other disturbe~ areas are to be see~~~: <br />1. That th~ trees in Rrea 1 will be - inches in ~iam~ter: <br />That the trees in area ~ will be 2~-' in~hes in diametpr <br />and that IS such trees will be plante~: <br />S That trees in area 1 will be 8 - 10 feet in h~ight and <br />that 8 such treeS will b~ plante~: <br />6. That trees in area ~ will be ?-2~ inces in diameter and <br />that 12-lS such trees will be planteA: <br />7. That trees in area 5 will be 2~-~~ inces in diameter and <br />7 such trees will be planted, <br />8. That the sioewalks ~.vill be concrete with a textured finish <br /> <br />vTE' wouli! a~(I that "Je fo have on file a plan showing the above <br />listed information. We would suggest that the quantity of trees <br />referred to in area I be specifieA. We would also suggest that <br />the plans for the Career Development Center be signed by the applicant <br />and the Building ana Planning Coordinator. <br /> <br />The proposed building does conform to the Master Plan as <br />required by SP-58 ~ll Cooe requirements are met pxcept as discussed <br />in the Master Plan discussion and as except discussed herein <br /> <br />Planninq Commission Consideration (Mav 18, 1976): <br /> <br />The Planner reveiwe0 his comments noting that acco~ding to <br />SP-58, uniten Theological Seminary is required to submit and have <br />approved a Master Plan, prior to the issuance of any building permits <br />for the SE'minary. It was further notod that both theMaster Plan <br />and building permit require a public hearing bE"fore the City council. <br /> <br />Mr. Al French and Dr. Hultgren were present to answer questions <br /> <br />Mr. French noted that the plans have been submitten to comply <br />with the SP-~8 resolution. Mr, French further indicated that he <br />has calculatE"0 the floor area ratio and has founA that ~igure to <br />~ .IA5 Mr. French indicated that ~he Seminary is pl3nning an <br />expansion program to reach the 290 student limit approve(l previously <br />by the City Council, and that the plans submitted are skptch"'''l df':>tails <br />of how that will be accomplished. <br /> <br />Frdrickson asked what pE"rcentage of students would be li.ving <br />on the Seminary campus. <br /> <br />Dr. Hu ltgren indicatea that appro}~imatelv 21:;% of the students <br />would E'ventually be living on campus, Dr Hultgren emphasized <br />
The URL can be used to link to this page
Your browser does not support the video tag.