Laserfiche WebLink
<br />-4- <br /> <br />~.. It should also be noted that the PRO approval requires a 25 root <br />-"" bu i I ding setback around the per i meter of the ent ire PRO. Those <br />decks shown protruding into the 25 root setback along the western <br />edge or the development will not be permitted. <br /> <br />c. <br />