Laserfiche WebLink
<br /> <br /> <br />Page 7 <br /> <br />6. RCWD: <br /> <br />The Watershecl pis;t:rictapproved a permit for the <br />Walburn Industrial Park plat. The proposed structure <br />would be constructed on lot 1 of said plat. <br /> <br />7. Other Considerations: The MPCA has detected evidence of soil and <br />ground water contamination on the Walburn Industrial Park <br />site. Subdivision of the property is permissable,however, <br />development of the property would require the applicant to <br />submit plans and specs to the MPCA for review and comment. <br /> <br />Building <br /> <br />1. Structure Size: <br /> <br />33,600 square feet total <br /> <br />2. Structure Height: <br /> <br />23 feet; I-3 district maximum height is <br />40 feet. <br /> <br />3. Exterior Treatment: Paintedrockface concrete block, main <br />entrance and awnings. <br /> <br />4. UBC Compliance: <br /> <br />To be determined <br /> <br />5. Other Considerations: <br /> <br />None <br /> <br />Sanitation/Housing <br /> <br />1. Seating Requirements: NA <br /> <br />2. Kitchen Facilities: NA <br /> <br />3. Garbage/Rubbish Enclosures: <br /> <br />Dumpster to be enclosed <br /> <br />4. Other Considerations: <br /> <br />None <br /> <br />Parks <br /> <br />1. Impact on Parks: <br /> <br />NA <br /> <br />2. Impact on Community Facilities: NA <br /> <br />3. Other Considerations: <br /> <br />None <br /> <br />Forestry <br /> <br />1. Tree Preservation: <br /> <br />NA <br /> <br />2. Proposed Trees: <br /> <br />Appears compatible; except Japanese <br />Yew should be replaced by full-sun <br />plant. <br /> <br />3. Other Considerations: <br /> <br />None <br /> <br />Fire <br /> <br />1. Access to Site: <br /> <br />Adequate <br /> <br />