Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />Council Meeting Minutes <br />April 25, 1989 <br /> <br />Page 11 <br /> <br />Public Hearing, continued <br /> <br />Brandt sa; d it was discussed at the 1 ast Economi c Development <br />Commission meeting to extend the designation of the Long Lake Road <br />in~o the area of 10th Street NW. Opus is hopeful, because of their <br />project1s name, that the City may consider changing 10th Street NW <br />to Long Lake Road. Brandt asked if a dual designation could be <br />considered in this matter. Council directed staff to investigate <br />the procedures involved in the name changing of this portion of 10th <br />Street. <br /> <br />Thre were no comments from the audience. <br /> <br />Motion by Gunderman, seconded by Larson, to CLOSE THE PUBLIC HEARING <br />FOR A PLANNED UNIT DEVELOPMENT, MINOR SUBDIVISION, AND SITE PLAN <br />REVIEW TO CONSTRUCT A 3-STORY OFFICE BUILDING IN A B-3 DISTRICT/OPUS <br />CORPORATION. <br /> <br />5 Ayes - 0 Nayes, motion carried <br /> <br />Motion by Brandt, seconded by Larson, to WAIVE THE READING AND ADOPT <br />THE RESOLUTION APPROVING PUD-4, PL-178, AND lP-241, SUBJECT TO THE <br />FOllOWING CONDITIONS: <br /> <br />I. APPROVAL OF CURB CUT ALONG 10TH STREET NW BY RAMSEY COUNTY. <br />2. PERMIT APPROVAL BY RICE CREEK WATERSHED DISTRICT. <br />3. THE PROPOSED SIX SPRUCE TREES AND FOUR FOOT HIGH BERM ALONG <br />10TH STREET NW BE CAREFULLY LOCATED TO ENSURE AN UNOBSTRUCTED <br />LINE OF SIGHT FOR MOTORISTS. <br />4. THE STORM WATER PIPE PROPOSED FOR THE SOUTHWEST CORNER OF THE <br />SITE BE REDESIGNED TO CARRY STORM WATER TO THE STORM WATER <br />RETENTION POND lOCATED IMMEDIATELY WEST OF THE SUBJECT SITE. <br />5. ; THE PROPOSED SPRUCE TREES BE A COMBINATION OF COLORADO BLUE AND <br />BLACK HIllS SPRUCE, THE PROPOSED EASTERN PINE OAK BE REPLACED <br />BY NORTHERN PINE OAK TREES, AND THE PROPOSED SPRING SNOW <br />CRABAPPLE TREES BE REPLACED BY EITHER SNOWDRIFT OR FLAME <br />CRABAPPLE TREES. <br />6. A PERFORMANCE BOND OR LETTER OF CREDIT BE POSTED WITH THE CITY <br />IN THE AMOUNT EQUAL TO 100% OF THE COST TO INSTALL ALL SITE <br />IMPROVEMENTS, EXCLUDING THE BUILDING, PRIOR TO ISSUANCE OF THE <br />BUILDING PERMIT. <br />7. ALL FINAL GRADING, DRAINAGE, AND UTILITY PLANS BE SUBJECT TO <br />REVIEW AND APPROVAL OF THE CITY ENGINEER. <br />8. APPROVAL OF PUD-4 AND Pl-178. <br /> <br />5 Ayes - 0 Nayes, motion carried <br /> <br />Public Hearing <br /> <br />Opus Corporation <br />3-Story Office Bldg. <br />Report 89-119 <br />Resolution 89-63 <br />Resolution 89-64 <br />9:12-9:27 p.m. <br />