Laserfiche WebLink
<br />- ' <br />S'ECTION 875: 50 <br /> <br />with that authorized permit. Ih particular the Building Inspector <br />may require the person responsible for land excavation to refill <br />any excavation site which adversely affects the general health, <br />safety, and welfare. Furthermore, the Building Inspector may <br />require the person responsible for land reclamation to cover any <br />non-earth fill with clean earth if such is not done within a <br />reasonable time of the filling or depositing. Any such positive <br />act should be performed by the permit holder within thirty (30) <br />days after a given written notice to the applicant of such <br />requirement, and before any further reclamation or excavation work <br />on the site shall proceed. The Village may further require a <br />bond in an amount that is deemed sufficient to cover e1e expense <br />of restoring the site to a reasonable condition, and said require~ <br />ment can be made a conditiorl precedent to the obtaining of a <br />permit. <br /> <br />SECTION 875:50 Exception, Construction. Any excav3tion <br />that is necessary for the construction of any structure when said <br />structure will replace the excavated materials, and when the <br />excavated materials--which consist of clean earth--are to be used <br />in the final grading of the building site is not covered by this <br />ordinance. It is hereby required, however, that said excavation <br />will proceed only after the persons responsible have legally <br />obtained a building permit for said structure. The issuance of <br />said permit shall require due consideration of the intended grading <br />work as required by this ordinance and other chapters of the <br />village Code. <br /> <br />, <br /> <br />!. SECTION 875: 60 Enforcem~!1t" Penaltv_. This ordinance sha 11 <br />be administered and enforced by the Building Inspector, and he <br />may institute in the name of the village of New Brighton any <br />appropriate actions or procedures against a violator, as provid~d <br />by law. Any applicant who, having obtained a permit shall fail <br />to comply v.lith any of the conditions upon 'which the same is <br />issued, in accordance with this chapter, or who fails to complete <br />a land reclamation project in the time prescribed in the <br />application for permit, or who fails to act in accordance with th~ <br />work authorized by the permit, shall be in violation of this <br />chapter and shall be guilty of a misdemeanor. <br /> <br />" <br />