My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP-082 (2)
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Special Use Permit File PLZ 02100
>
SP 001-100
>
SP-082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2007 11:26:09 AM
Creation date
2/9/2007 4:15:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />page 2 <br />August 3, 1978 <br /> <br />Overall, we see no problem in regard to the Special Use Permit. <br />The use is one that could be deemed essential or desirable for <br />the public convenience and welfare. The use is also one that <br />appears to be rather low-key in termS of traffic as only 6 <br />employees presently work at this location and it is anticipated <br />that after the proposed expansion only 2 employees will actually <br />be at the building fulltime. Finally, in the past years the <br />present use has appeared to co-exist well with the surrounding <br />neighborhood. <br /> <br />STAFF RECOMMENDATION <br /> <br />Staff recommends that SP-82 be approved by simple motion. <br /> <br />NON-CONFORMING USE PERMIT, NC-32 <br /> <br />The following Type IV non-conformities exist on the telephone <br />company property: <br /> <br />1. Lack of concrete curbing adjacent to. parking areas. <br /> <br />2. Parking spaces less than required size. <br /> <br />3. Less than the number of required parking spaces. <br /> <br />4. Lack of sufficient screening at north property line <br />adjacent to an R-1 zoning district. <br /> <br />S. The existing building is less than SO feet from the <br />R-1 zoned land on the north. <br /> <br />In regard to the non-conformities the applicant has indicated that <br />the following improvements will ~~ made: <br /> <br />1. All required concrete curbing will be installed. <br /> <br />2. The required screening in the form of a fence will <br />be installed at the north property line adjacent to <br />the R-1 zoned property. <br /> <br />3 . All parking spaces will be the required size. <br />
The URL can be used to link to this page
Your browser does not support the video tag.