My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECM 04-01-1981
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
MINUTES
>
1981
>
PRECM 04-01-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2007 4:08:37 AM
Creation date
3/15/2007 11:58:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 1, 1981 Park. Board Minutes. Page 2 <br />A. Walburn Industrial Park Preliminary .Plat (Continued) <br />There was a motion by the Board of Review Chairperson to accept <br />the: discussion as a concept discussion only. Motion passed. <br />Another Board of Review person stated he would like to hear from <br />the applicant. <br />Gunderman agreed. <br />Dale Hebeisen of Hult and Associates, expressed his concern that <br />with. this triangular piece of property; meeting al codes would be <br />hard to do. There is alot of road frontage. The building setbacks <br />are not shown on the map because it would be confusing to read. <br />Gunderman asked what happens with Beisswenger's. <br />Hebeisen. replied it would probably improve Beisswenger's as far as <br />parking. <br />A Board. of. Review member asked what the intent of plotting the parcel <br />was. <br />Hebeisen replied just to sell. <br />Dick Bury .introduced himself at that time stating he is .owner of <br />-Midwest Asphalt/Walburri. He said he is sympathetic. to the situation. <br />He said he has owned Midwest Asphalt for 12 years. During that time <br />he did-what he could to improve the area as a lease holder from <br />Minnesota Transfer. Eventually Bury and two others purchased the <br />parcel from the Railroad in a partnership. The name Walburn is a <br />combination of the three names. He needs IO acres to operate properly. <br />That leaves 20 acres that are developable by others. The road will <br />have to go through the old gas station. Would get rid of the old <br />building. Would like to keep. the storage system. The shop will be <br />relocated. .The two small buildings will be replaced by one small <br />building. Intend to cleanup and make as pleasant looking as <br />possible. Have another plant in-Eden Prairie that is .well up to <br />code. That plant ironically has the same problem. The New Brighton <br />plant would operate 110 days of the year. November-April the plant <br />is.non-operative. Would like to do landscaping and make as pleasant <br />as po sible. Working with the. triangular piece is not easy. Has <br />been told this site is the best .industrial site .Left in the Twin <br />Cities. The reason for plotting i because alot of money is invested. <br />#2 and #3 .can. be put up for-sale. Hope to have site plan for review. <br />Access to park was mentioned and is not out of the question.-but the <br />property is worth about $50,000-$60,000. <br />Van Hatten asked if there is only one spur on property.. <br />Bury said yes, and it will be rebuilt. <br />Van Hatten asked if it is an asset: <br />Bury replied yes,, definitely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.