My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECM 01-07-1981
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
MINUTES
>
1981
>
PRECM 01-07-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2007 4:07:22 AM
Creation date
3/15/2007 12:07:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• <br />~""~"~ <br />~ C +(~, h t .t~ L Q ~1 ~Gi. .5 <br />While parks and open space represent <br />leisure and tun to most citizens, adop- <br />tion of a new regional recreation open <br />space policy plan represented a major <br />Council work effort in 1980. <br />The plan estimates the outdoor recrea- <br />tion needs of the Metropolitan Area to <br />the year 2000 and selects park facilities <br />to meet those needs. When it is trans- <br />. formed from paper to reality, citizens <br />will find 11 more parks and six more <br />park reserves than the system now con- <br />tains. The plan also calls for extensive <br />development of the regional park sites. <br />The plan contains several major ele- <br />ments that distinguish it from the 1974 <br />park plan, which it replaced: <br />The capital improvement program <br />(C1P) included in the new plan calls for <br />expenditures of some $31 million for <br />acyuisition and development in 1981- <br />82. However, the Council is now work- <br />ing with the implementing agencies to <br />cut the CIP total down to the range <br />suggested by the state llepartment of <br />Finance, $22.5 to $27.5 million. <br />Good parks benefit virtually everyone <br />and are a major factor in the high <br />"yuality of life" of this Region. The <br />increasing cost and scarcity of gasoline <br />make it even more urgent that a "near- <br />in" regional park system be completed <br />and readily accessible to the half of the <br />state's people who live in the Seven- <br />County Area. <br />[t sets forth policies on providing <br />levels of regional recreational facil- <br />ities and levels of costs to taxpayers <br />that are equitable throughout the <br />Metropolitan Area. Policy 22 says <br />the parks should have consistent <br />basic operating policies and a stable <br />and equitable method of financing <br />their operation and maintenance. <br />2. [t limits the number of implementing <br />agencies, which own and operate <br />the regional parks, to 10: the seven <br />counties and the cities of St. Paul, <br />Minneapolis and Bloomington. <br />3. It changes the status of several <br />park sites from the earlier plan: <br />-Hampton Woods, St. Francis <br />Hills and Mississippi Islands are <br />dropped. <br />- The regional parks of Lake <br />Minnetonka, Anoka County <br />Riverfront, and the Mississippi <br />Gorge, plus aspecial-use facility <br />to provide public access to Lake <br />Minnetonka, are added. <br />- Six regional sites are. reclassified: <br />Big Marine Lake, Miesville Ravine <br />and Upper Grey Cloud Island <br />from parks to park reserves; <br />Grass-Vadnais, South Washington <br />County and Lebanon Hills from <br />park reserves to parks. <br />About t 3,500 acres remain to be ac- <br />quired to complete the system. Most <br />of the newly acquired lands remain to <br />be developed. <br />Besides acquisition and development <br />funding, which the Council provides, <br />funding operations and maintenance of <br />the regional park system has become a <br />significant problem. While the Council <br />does not plan to recommend a shift <br />from local financing of these costs in <br />1981, it expects to recommend doing <br />so in the 1982 session. Concern on the <br />part of implementing agencies about <br />this increasing tax burden has become a <br />major impediment to implementation of <br />the regional park system. <br />Enmeshed in this issue is a key Council <br />goal for the system: to achieve an <br />equitable distribution of regional parks <br />around the Metropolitan Area. The <br />western portion of the Area is much <br />further along and moving at a more <br />rapid pace than the eastern section. <br />Local funding overlooks the fact that as <br />a regional facility, the park may be <br />needed primarily for residents of other <br />counties. Also at issue is equity. The <br />amount of tax money paid by each <br />citizen annually in the Metropolitan <br />Area for regional park operations varies <br />widely, from 99 cents to $15.50. <br />The Metropolitan Parks and Open Space <br />Commission helped the Council develop <br />the new plan and advises the Council in <br />carrying out the regional system <br />through review of implementing agency <br />plans and grant requests.- The Council <br />has granted $82 million since 1974 to <br />buy and develop regional parklands <br />under the 1974 Metropolitan Parks Act. <br />Minn. Slat., secs. 473.301-473.341 <br />(1978). <br />Nuu~y t„u.....y,..,,,,, uy t <br />Metropolitan Solid Wast <br />Slat., secs. 473.801- 47 <br />That plan recognized the <br />diminishing landfill capa <br />priorities that emphasize <br />lion, waste recycling, an <br />recovery. <br />In support of the Counc' <br />Legislature passed the 1 <br />Management Act, a toug <br />provide the rpachinery t <br />done. It contains enforc <br />and deals with both soli <br />waste as well as sewage s <br />Minn. haws 1980, cl:. S <br />The law authorizes spen <br />million for waste manag <br />ning, site selection and a <br />for demonstration prole <br />The law requires selectiu <br />lion of: at least one site <br />waste in the state by J u <br />for chemical processing, <br />and temporarily storing <br />wastes; sites for landfills <br />politan Area to handle t <br />and other solid wastes h <br />and sites for the Area's s <br />ment residues -one. for <br />and one for screenings, <br />erator ash. In addition, <br />plans to reduce and reus <br />fewer land disposal facil <br />In the months since flee <br />the Council has stayed ca <br />meeting its assigned rest <br />In 1980, the ('uunril <br />- Completed a repast t <br />the needed landfill ds <br />in the Metropolitan <br />now and the. yeas :O( <br />Developed a grant ati <br />the seven metruprlil, <br />fund county-level pi <br />tify four potential ,a <br />sites and one drmuli <br />lion debris landfill si <br />county. <br />- Held well-attended p <br />to review sludge. and <br />siting issues with the <br />law requires the Cou <br />three candidate sites <br />three candidate sites <br />1981. <br />- Completed a disposa <br />report that estimate <br />lion, recycling, proc <br />source recovery, the <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.