Laserfiche WebLink
March 3, .1982 Park. Board Meeting Page 3 <br />Small Group Picnic Area & Swimming Area <br />10.0 parking spaces, .shelters hold about 50 .people (about 4 <br />buildings planned), picnic tables will. be scattered, trail <br />system connects with the one in the large group area, beach <br />is about 500-550. feet excavated for shallow area for safety. <br />Bathhouse will be multi-purpose building for-all seasons. <br />Parking for 150 cars, area will be fenced in and a fee charged <br />to enter. <br />A resident asked the beach capacity. <br />Simons said about .1,200. <br />A resident asked what the total parking capacity was for the <br />entire park. <br />Simons said about .515 cars. <br />A resident asked what the total land acres are. <br />Simons said 211 acres. <br />A resident asked what the parking lots will be made of <br />Simons said asphalt with concrete curbs. <br />.Concept Detail - Boat <br />5 spaces for high speed tr.ailered boats <br />15 spaces .for trailered .fishing boats <br />The cars will be monitored by a-gate attendant at the <br />entrance on Old Hwy. 8. <br />A resident asked what the boat capacity is for the lake. <br />Simons said 9 boats-are capacity according to Metro Council. <br />A resident asked if small horsepowered boats would be monitored. <br />Simons said no. <br />South End Fishing Dock <br />5 docks for shoreline fishing., 52 car parking lot, 2 spaces <br />for emergency vehicles, parking for cars with sailboats, <br />canoes or boats on top, Access also for winter. There <br />is a bikeway and also toilets. 5 parking spaces for <br />trailers, l0 for boats on top of car. <br />A resident asked if this would be designated as an official <br />public access by the DNR. <br />Simons said yes.. Metro. Council and the DNR have the same standards. <br />