June 28, 1985 <br />Page 3 <br />to remove the remaining material. Environmental Services Group <br />returned on June 24th to complete the job and an additional 953 <br />tons was removed. The Metropolitan Council appropriated 345,000 <br />for the removal. The Director of Parks and Recreation will <br />request Metropolitan funding for the additional over-run casts. <br />(see County Attorney's report for additional information).. <br />Additional Construction to complete Phase I <br />1.) Gas, Electric and Telephone to the beach building <br />Each of these underground utilities will be installed <br />by the utility companies during the summer of 1485. <br />Metro funds have been provided for these services. <br />Cost estimated: 326,000 <br />2.} Additional Soil for Fill <br />Additional good soil, not avai]able on the site, is <br />needed to fill several areas where the grade is law <br />or there is not enough soil aver unsuitable fill. <br />,Arrangements have been made with Schafer Contracting, <br />who has excess sail from a nearby road construction <br />project, to place good soil in these areas at no cost. <br />3.~ Railroad Signal Agreement <br />The entrance road to the park crosses the Minnesota <br />Transfer Railroad. In 1984, the Minnesota Department <br />of Transportation issued an order far the crossing. <br />This order required the Railroad to allow the crossing. <br />The order also specified the crossing signal would <br />have to be constructed and be in operation prior to <br />public use of the park. <br />On February 25, 1985, the County Board approved a <br />request to the Metropolitan Council to provide funds <br />for the construction of the signal. Subsequently, <br />funding was approved by Metro. Cost estimated: 341,000. <br />An agreement is currently b~ <br />Minnesota Transfer Railroad <br />maintenance of this signal. <br />brought to the County Board <br />The biggest issue yet to be <br />maintenance cast. <br />ping negotiated with the <br />for construction and <br />This agreement will be <br />for approval this summer. <br />agreed upon, is the annual <br />All of the above described Phase I projects will be <br />completed by the fail of 19$5. The park will open in <br />the spring of 1986 for use of the beach. <br /> <br />