Laserfiche WebLink
-3- <br />Proposed Development Schedule <br />• 1986 <br />Grading <br />Dredging <br />Utilities <br />Turf e$tabli~hment ~ ball field <br />1987 <br />Play Equipment <br />Planting, trees & shrubs <br />1988 <br />Shelter <br />Pathway <br />Picnic shelter <br />The City"Engineering Department cannot prepare the grading plan in <br />time for 1986 construction. -Staff is suggesting that Damon Farber <br />and Associates be retained at a fee of $6,000 to prepare <br />a grading-plan and bid specifications for phase one of this project. <br />Construction supervision, infield and backstop installation would <br />be .done by city forces. <br />• <br />• <br />