My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECM 10-07-1987
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
MINUTES
>
1987
>
PRECM 10-07-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 2:17:35 AM
Creation date
4/2/2007 2:17:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 7, 1987 Park Board Minutes Page 2 <br />Anderson said the biggest <br />trail is that it could be <br />the trail down Mississipp <br />before it is done. There <br />to do the Poppyseed trail <br />done anyway. <br />advantage to doing the Poppyseed <br />done in the spring of 1988. If <br />i is done it could be 1991 or 1992 <br />is little or no more money needed <br />because all the work has to be <br />Suggest doing the Poppyseed trail and if it doesn't work, <br />then the Mississippi trail could be done. <br />Johnson said his understanding from the meeting was that it <br />was one or the other but not both. The Mississippi trail <br />would seem the most natural access. <br />Anderson said the Mississippi one could still be done. The <br />bridge is part of the. trail plan, not the park plan. The <br />Advisory Committee has nothing to say about the trail. The <br />Park Board could say they want the Mississippi one. The <br />other trail would be a temporary one. <br />Johnson said he doesn't see any additional cost. <br />Carlson said he also got the impression that it was either <br />one trail or the other but not both. If the Poppyseed trail <br />is put in, would it jeopardize the other bridge? <br />Anderson said it will jeopardize it. It will make it less <br />likely but it doesn't mean absolutely not. <br />Anderson said the county can say not we are not going to put <br />in the Mississippi trail, but it is still in the trail plan. <br />The plan still calls for a bridge. <br />Johnson said Pat Comers was not present at <br />an effort is being made to get information <br />homeowners about the large picnic area she <br />cost is about $300,000, 100 parking spaces <br />Liked the shelter design. <br />Carlson said he liked the design but would <br />top part of the roof dropped. <br />the meeting and <br />out to the <br />Lter change. The <br />are planned. <br />like to see the <br />Johnson said John Schultz was upset because the County <br />changed the beach building design without the advisory <br />committee's approval and feels it may happen again with this <br />shelter building. <br />Johnson said some residents expressed concern about the <br />trail being too near their property. <br />Anderson said trails are the least obtrusive thing. <br />Carlson said the trail has-been there 75 years, it used to <br />have tractors on it. <br />
The URL can be used to link to this page
Your browser does not support the video tag.